Two (2) units of boilers are proposed to be installed at Lotte Chemical Titan’s plant in Pasir Gudang in order to meet the plant steam requirement and provide ample steam cushion for plant operability.
The capacity of each boiler is 90 TPH, and each package is equipped with:
- Economizer
- Forced Draft (FD) Fan
- Ducting and Chimney
- Chemical Injection Skid
- Metering Unit/ Skid
IFP provided Engineering Design services for this project in accordance with the local regulations, engineering best practice, and international codes & standards.